For gyms & personal trainers

Members stay when they see it working.

Yok puts your programme on every member's phone: today's session, targets filled in, progress on a chart. They lift, they log, and every set lands back in your view.

installs to the home screenyour logo on the iconyour colour throughoutno app store

The workout builder on a laptop: six exercises with sets, distance and rep targets and a three-round superset
A member's phone: Sunday, two classes on today — Foundations 10:00 and Strength 17:30 — each with a start button
Member retention

Churn starts as drift.

Churn is the biggest cost a gym carries, and it starts quietly: no plan for today, no sign of progress, nothing from the gym between visits. Members drift before they cancel. Yok closes each of those gaps.

A plan for today

The app opens on today's session: written by you, targets on every set. A member who knows exactly what they're walking into keeps walking in.

Proof it's working

Every logged set lands on a chart: top set over time, real sessions. A number that keeps rising is a better reason to stay than any offer you could run.

Your gym, on their home screen

It installs as your gym's app — your logo on the icon, your colour on every screen, not a stranger's logger from an app store. Between sessions, the gym is one tap away.

The walkthrough

Pick your side of it.

The app has two ends: the coaches who run the gym, and the members who train. Walk through whichever one is you.

Walkthrough
Book a demo

Running a gym

01 / 08 · build

Sessions, targets, order.

One screen. Sets × reps for the lifts; metres, minutes or calories for the ergs; a superset with its rounds. Type it in once — the notebook and the spreadsheet retire.

Workout builder: Ski Erg 4 × 250 m, Sled Push 4 × 20 m, a three-round superset of Wall Balls and Kettlebell Swing, then Burpee Broad Jump and Row Erg — all changes saved
02 / 08 · schedule

Drop it on the week.

The week repeats. Members see it by day. The 06:30 class is on their phone before they've left the house.

Weekly timetable: nineteen classes across the week, each day a column with its times and workouts, the Premier programme running week 3 of 8, today marked
The coach view of one member on a phone: Freya Marsh's masthead — last trained, sessions a week, member since — a training-rhythm chart and every lift with its trend and best
03 / 08 · oversee

Watch it land.

Every logged set comes back to one place: who trained, what moved, who's stalled — every lift with its trend, every new best marked, their check-ins beside it. From your pocket, on the floor.

04 / 08 · right now

Who's on the floor.

The members page shows who's training right now and what they're lifting — and a member's session grows in your view, set by set, as they log it.

The members page on a phone: an 'on the floor' card with six members mid-session — each with their current exercise and last-set time — above the full members ledger
05 / 08 · on the wall

On the screen at the gym too.

Today's class goes up on the gym's TV from the same source: the countdown to the start, every station with its target, and the code a new member scans to install. Nothing retyped on a whiteboard.

The gym wall screen: Foundations, today at 10:00, starts in 4 minutes 26, six on the floor — six stations listed with their targets and a get-the-app code
The branding page: one brand hex typed in, previewed as the log-set button on the dark and light surfaces with its contrast ratio, and a save-colour action
06 / 08 · your colour

Your colour, your icon.

One hex and the whole app wears it — the buttons, the charts, the icon on their home screen. Clamped for contrast on light and dark, so it always reads.

07 / 08 · onboard

One code, a whole intake.

Invite one member with a single code, or open a reusable gym code a new intake joins with — members onboard themselves, no admin at the desk.

The invite panel: a generated gym code 4F2861 with 25 seats, none used, expiring in a week, in the live gym-codes ledger
08 / 08 · include everyone

Built for everyone.

Some members don't do apps. Clear view gives them big buttons, one exercise at a time — even their progress reads as a sentence, not a chart. You turn it on for them, so the hardest members to keep don't quietly drift off.

Clear view: logging Goblet Squat, target 3 × 12, with large plus-and-minus steppers for weight and reps, set 2 of 3, and one big save button
Clear view progress: Back Squat — 'New personal best!' said in plain words above a rising three-month chart
The whole gym

Built for how a gym actually runs.

Not a logger per coach — one gym, held in common, reachable from anywhere.

Every coach, one gym

Add coaches as the team grows. They share the same members, the same exercise library, the same programmes and the same timetable — and a session logged for a member says which coach logged it.

COACHES · SHARED MEMBERS · SHARED PROGRAMMES

Written anywhere, lands everywhere

Build a workout on the sofa, drop it on Tuesday's timetable or put it on one member from your phone — it's on their home screens, and the screen on the gym wall, the moment you save.

SAVED ON THE SOFA → ON THE FLOOR AT 06:30

Nothing lost to a dead signal

Gym Wi-Fi drops mid-set and nothing is lost. Logging carries on offline and the sets sync back the moment the signal returns.

OFFLINE MID-SET · SYNCS BACK · ZERO LOST

The serious stuff, as standard

Health screening (PAR-Q) held as consented health data. Who-sees-what enforced in the database, not just the interface. Members export or erase everything themselves. Givens — but givens done properly.

CONSENTED · DB-ENFORCED · EXPORT & ERASE

What it costs.

One gym, all your members, your name on it.

Pricing

Pricing is agreed per gym. It depends on size and what you need. Ask, and you'll get a number, not a call funnel.

See it with your programme in it.

A 20-minute walkthrough with one of your real sessions typed in, so what you're judging is your own gym.

goes straight to us. no list, no funnel. a reply from a real person.